Practical checklists
Clear inputs that help an estimator or project team prepare an enquiry.
Contractor Notes
Guidance for estimators, quantity surveyors, project managers and procurement teams preparing ventilation and ductwork installation packages.
01 / Latest notes
Each note starts with a question that can affect pricing, coordination or delivery. The guidance is practical, qualified and connected to a clear next step.
A focused checklist for a more useful initial review of the installation package.
Read contractor note ↗The variables that determine a realistic crew for the available workfaces and programme.
↗ Scope / Note 03Record inclusions, exclusions and interfaces before mobilisation.
↗ Programme / Note 04Common information, coordination and access issues to review early.
↗02 / Procurement & delivery guides
Practical guidance for selecting, defining and planning a ventilation or ductwork package before mobilisation.

Compare scope, competence, coordination, programme assumptions and delivery evidence.
Read guide ↗
Review company information, insurance, competence, RAMS, capacity and controls.
Read guide ↗
Turn the actual work, location and hazards into a clear safe sequence.
Read guide ↗
Connect design release, procurement, access, workfaces and close-out.
Read guide ↗
Review structure, containment, ceilings, fire interfaces and access before installation.
Read guide ↗
Five things an accurate ductwork quotation depends on arriving together.
Read guide ↗
Normalise scope, exclusions and programme before comparing totals.
Read guide ↗
Duration is set by fabrication lead, zone availability, access and testing float.
Read guide ↗
What a complete handover pack contains, and why each piece matters.
Read guide ↗
What to check while ductwork is still accessible, before ceilings close.
Read guide ↗
What BESA's sheet metal ductwork specification covers, and what it doesn't.
Read guide ↗
Confirm scope, information, workfaces, logistics and project controls before mobilisation.
Read guide ↗
Plan deliveries, storage, lifting, access equipment and productive workfaces.
Read guide ↗
Record installed work, blockers, changes, evidence and the next reporting period.
Read guide ↗03 / Industry updates
Dated, sourced analysis of UK building-services developments that affect procurement, labour planning and delivery.

BESA has taken its building-services manifesto to Downing Street. What its five priorities mean for ventilation procurement and project planning.
Read verified update ↗
BESA’s October safety survey highlights client pressure and information overload. A practical response for ventilation instructions and evidence records.
Read verified update ↗
ECITB’s new PPE awareness modules address fit, compatibility and provision. Checks for supervisors preparing a ductwork installation team for site.
Read verified update ↗
A new Stanford report compares conditions in US commercial kitchens. What UK teams can ask about equipment, extraction and operating hours without overreach.
Read verified update ↗
CIOB has released a free drugs and alcohol policy template for construction firms. How to review responsibilities and site interfaces before adopting it.
Read verified update ↗
ECITB has expanded ACE eligibility and introduced digital cards and app renewals. What mobilisation teams should verify before relying on site credentials.
Read verified update ↗04 / Useful by design
Clear inputs that help an estimator or project team prepare an enquiry.
Prompts for responsibilities and interfaces that may need agreement.
Every note leads back to the information needed for a project review.
Send the current drawings, specification, scope and programme information for review.